Location: GlobalEnglish

Choose your location

info@wwbridges.com+971 52 912 3132
English
United Arab Emirates

G-Mark UAE: the regional mark next to ECAS and EQM

The first reply splits your product list into G-Mark, ECAS and national clearances for the Emirates, and says which files can start before an importer is named.

We’ll call you back within an hour.

We will call you back

We respect your time and your privacy. Your details are used to answer this inquiry and nothing else.

A few facts

One Gulf type examination, one ECAS per UAE applicant

GSO decides which appliances go to a notified body and how the mark is printed and kept. ECAS runs beside it.

  • 13 Appliance categories on GSO List No. 2 that need a Gulf Type Examination certificate
  • 10 years How long the Gulf Declaration of Conformity is kept for market surveillance
  • 5 mm Minimum height of the mark, unless the regulation says otherwise
  • 4–10 Weeks for the G-Mark, run in parallel with ECAS

Source: GSO, Gulf Conformity Mark and Conformity Tracking System; MoIAT

What it costs

ECAS in three packages, priced

See what each package includes
  • Express

    ECAS RoHS only

    from $2,380

    5–7 weeks+ MoIAT fees and laboratory costs
  • Maximum

    ECAS, Emirates Quality Mark and support

    Customized

    timeline and price set for your project
How it works

Five steps from an inquiry to a registered certificate

Typical timeline4 to 10 weeks, in parallel with ECAS

  1. You send the request

    Product name, HS code and technical data, enough for us to scope the route.

    Your part
  2. We confirm the route

    A specialist confirms the regulations that apply and the document type your product needs.

    Our part
  3. Documents and contract

    You send the supporting documents; we sign a contract with fixed scope and timeline.

    Both sides
  4. Testing and inspection

    Laboratory testing, factory inspection and customs clearance, coordinated by us.

    Our part
  5. You receive the certificate

    Issued, registered, and delivered. We close the project.

    Your part
  • One named specialist One person owns your file from the first email to the registered certificate.
  • Route fixed before testing Scheme, standard and laboratory are settled before a sample is tested, which is where most re-testing starts.
  • Registered documents Certificates and declarations issued by accredited bodies and entered in the official register, where customs can look them up.
  • Measured by the document The engagement ends when the certificate is issued and registered, whatever the hours took.
The short answer

Gulf mark per type, ECAS per importer

In the UAE the G-Mark is the regional layer and ECAS the national one; a product inside both carries both. In the United Arab Emirates the G-Mark is the regional layer and ECAS is the national one, and a product inside both carries both. What exporters call G-Mark UAE means the GSO technical regulations BD-142004-01 on low-voltage electrical equipment and appliances and BD-131704-01 on toys, as the Emirates apply them: a Gulf Type Examination certificate from a body on the GSO register for regulated-list appliances and toys, the Gulf Conformity Tracking Symbol on product and packaging, and a registered self-declaration for other low-voltage equipment. The Ministry of Industry and Advanced Technology (MoIAT) is the national authority; it runs ECAS and the Emirates Quality Mark and issues the ECAS certificate to a UAE-registered applicant. The G-Mark is per type and belongs to no importer.

  • Two GSO regulations What exporters call G-Mark UAE is BD-142004-01 on low-voltage electrical equipment and appliances and BD-131704-01 on toys, as the Emirates apply them.
  • Type examination or declaration Regulated-list appliances and toys need a Gulf Type Examination certificate from a body on the GSO register. Other low-voltage equipment goes on a registered self-declaration.
  • Tracking symbol on the box The Gulf Conformity Tracking Symbol goes on the product and on its packaging.
  • ECAS per applicant, mark per type MoIAT, the national authority, runs ECAS and the Emirates Quality Mark and issues ECAS to a UAE-registered applicant. The G-Mark is per type and belongs to no importer.
  • List No. 2

    Thirteen appliance categories on GSO List No. 2 (TC143307-01), among them fans, irons, water heaters and air conditioners, need a Gulf Type Examination certificate, the tracking symbol and an ECAS certificate from MoIAT.

    Air conditioners, refrigerators and washing machines add the energy label: three filings from day one.

  • Two holders

    The G-Mark and the Gulf Declaration of Conformity sit with the manufacturer or its legal representative in the GCC. ECAS names a UAE-registered applicant, runs one year and is matched to the consignee at customs.

    Keep the G-Mark in your name and let each distributor hold its own ECAS.

  • The tracking symbol

    The GCTS goes on product and packaging beside the G-Mark and the body's identification number. GSO publishes its product and notified-body registers, so an inspector with a phone can check the certificate.

    The symbol has to resolve to a live certificate from a body on GSO's list.

Already started elsewhere

Did your G-Mark and ECAS project for the Emirates stall?

One GSO rule catches exporters who let each UAE distributor run its own file: a product may be applied for at one notified body only. Two bodies hired for the same kettle leave one certificate and one withdrawal, reported to GSO and every other body. A CB report to an edition superseded more than two years ago means a retest first. And a toaster shipped on a self-declaration arrives with no GCTS on the carton.

The G-Mark is per type and belongs to no importer. A change of distributor means a new ECAS certificate and leaves the Gulf Type Examination as it is. A change of notified body goes further. The new body issues a new certificate, the old one is cancelled, and the GCTS registration changes, so the symbol on every unit, carton and manual has to change too. ECAS certificates run one year in the applicant's name.

What we handle

  • Scope split
  • Notified body
  • Testing
  • GCTS registration
  • ECAS filing

What to send us

Everything here is something to find before the project starts. The first reply says which of it can go into the file as it is.

  • The technical file
  • The CB or IEC test report, with the standard edition it cites
  • Rating plate and plug drawings
  • The Gulf Type Examination certificate and the notified body’s identification number
  • A photo of the carton showing the G-Mark and GCTS as printed
  • Importer details: each UAE distributor’s ECAS certificate, or the applicant you intend for each

We’ll call you back within an hour.

We will call you back

We respect your time and your privacy. Your details are used to answer this inquiry and nothing else.

  • 2010 Year of foundation
  • 1300+ Certification projects
  • 40+ Countries served
  • 15+ Types of certificates

Which products need the G-Mark and ECAS in the UAE?

Three groups. Household appliances on GSO List No. 2 (TC143307-01) need a Gulf Type Examination certificate from a GSO-notified body, the Gulf Conformity Tracking Symbol and, because low-voltage equipment is a UAE regulated group, an ECAS certificate from MoIAT as well. The list has 13 categories: fans, refrigerators and freezers up to 850 litres, washing machines and dryers up to 12 kg, food mixers and juicers, toasters, hair dryers, room heaters, microwave and other ovens, water heaters up to 200 litres, irons, plugs, sockets, adaptors, extension cords and chargers, and air conditioners.

Other low-voltage equipment, rated 50 to 1,000 V AC or 75 to 1,500 V DC, carries the G-Mark on a self-declaration registered with GSO and still needs ECAS in the Emirates. Toys for children under 14 need the type examination and ECAS. Cosmetics, detergents, textiles, tyres and lubricants sit under UAE Cabinet resolutions and take ECAS alone: no GSO regulation that carries the G-Mark reaches them.

The G-Mark-only case in the UAE is a timing case rather than a product case. The type examination can be finished before a distributor is signed, while the ECAS file waits for the UAE-registered applicant. Air conditioners, refrigerators and washing machines add the energy-efficiency label on top: three filings from the first day. What exporters search for as G-Mark certification UAE is these files run together.

Who applies for the G-Mark in the UAE, the manufacturer or the importer?

The manufacturer, or its agent in the Gulf, for the G-Mark; a UAE-registered company, in most cases the importer, for ECAS. GSO's regulation on G-Marking, BD09100501, puts the mark and the Gulf Declaration of Conformity in the name of the manufacturer or its legal representative in the GCC, and the declaration has to be kept for ten years and shown to market surveillance on request. The ECAS certificate names the applicant and the product, runs for one year, and customs matches that name to the consignee.

So a manufacturer with two UAE distributors holds one type examination and two ECAS certificates. One test report serves both, since BD-142004-01 gives an IECEE CB scheme report a presumption of conformity.

One GSO rule catches exporters who let each distributor run its own file. A product may be applied for at one notified body only, and a rejected or withdrawn certification is reported to GSO and to every other notified body. Two distributors each hiring a body for the same kettle produce one certificate and one reported withdrawal. Keep the G-Mark in your own name; let the distributors hold their ECAS.

What do UAE customs and inspectors check on the tracking symbol?

That the symbol on the box resolves to a live certificate. For regulated-list appliances and toys the notified body registers the product in GSO's tracking system, and the Gulf Conformity Tracking Symbol (GCTS) must appear on the product and on its packaging next to the G-Mark and the body's identification number. GSO publishes both registers, products and notified bodies, with each body's status, and an inspector with a phone can check them. A G-Mark certificate UAE customs will accept comes from a body on that list on the day of issue.

The mark itself must be at least 5 mm high unless the regulation says otherwise, permanent and legible, and moved to the packaging or the documents only where the product cannot carry it. A CE mark beside it on the same rating plate is fine, as long as the two cannot be confused.

Changing notified body is a marking event. The new body issues a new certificate, the GCTS registration changes, and the symbol on every unit, carton and manual changes with it while the old certificate is cancelled. Switch bodies to save a fee and keep printing the old symbol, and the label points at a cancelled certificate; the port is where an inspector finds it.

What goes wrong with a G-Mark certificate at the UAE border?

Three things, and none of them is a failed test. The first is a certificate from a body whose GSO designation has lapsed. GSO can restrict a scope, suspend or withdraw a designation; the status is on the public list, and a certificate issued outside a live designation is paper. We check the register when the quotation is signed and again before the first shipment.

The second is a plug or rating plate that does not match the type examined. The certificate covers the type as the body saw it. A Gulf plug fitted after the tests, a different rated voltage on the plate or a new power board is a change the body has to assess first. The third is a regulated-list appliance shipped on a self-declaration. List No. 2 requires a Gulf Type Examination for its 13 categories, so a manufacturer's declaration satisfies the regulation for a power tool; for a toaster it satisfies nothing, and the gap shows when the GCTS is missing from the carton.

Timing follows the Gulf scheme: four to ten weeks for the G-Mark where CB reports to the current GSO edition exist, three to eight weeks for the ECAS certificate, run in parallel. GSO keeps the previous edition of each adopted standard valid for two years, so an older report means a retest first. Anything that transmits, Wi-Fi and Bluetooth included, also needs TDRA type approval through a registered UAE dealer: national, separate from both marks, and outside this page. Halal is a separate route as well.

Which UAE clearance each product needs

ProductG-Mark routeECAS from MoIATOther national clearance
Air conditioner, refrigerator, washing machineType examination, GCTSYes, per applicantEnergy-efficiency label
Toaster, iron, microwave, hair dryer, extension cordType examination, GCTSYes, per applicantNone beyond ECAS
Power tool, LED driver, other low-voltage equipmentSelf-declaration registered with GSOYes, per applicantUAE RoHS where in scope
Toy for children under 14Type examination, GCTSYes, per applicantNone beyond ECAS
Cosmetics, detergents, textiles, tyres, lubricantsNot in scopeYes, per applicantHalal for cosmetics with animal derivatives
Any of the above with Wi-Fi or BluetoothAs its categoryAs its categoryTDRA type approval, national

GCTS is the Gulf Conformity Tracking Symbol. TDRA type approval is filed by a registered UAE dealer and is outside what WWBridge provides.

Frequently asked questions

Do I need both the G-Mark and ECAS to sell an appliance in the UAE?

Yes, for low-voltage equipment and toys. The G-Mark comes from the GSO regulation and is checked as the regional mark; the ECAS certificate comes from MoIAT under the UAE control scheme and names the importer. Customs looks for both, and one CB scheme report serves both files.

Is a G-Mark certificate tied to my UAE importer?

No. The Gulf Type Examination certificate and the declaration are in the manufacturer's name, or its legal representative in the GCC, and cover the type wherever it is sold in the Gulf. ECAS is the document tied to the importer. A change of distributor means a new ECAS certificate and no change to the G-Mark.

Can I ship a toaster to Dubai on a G-Mark self-declaration?

No. Toasters are on GSO List No. 2 with twelve other appliance categories, and each needs a Gulf Type Examination from a notified body plus the tracking symbol. Self-declaration is for low-voltage equipment outside that list, such as power tools. A toaster on a declaration alone arrives without a GCTS, and the carton shows it.

How long does G-Mark certification take for the UAE?

Four to ten weeks where CB reports to the current GSO edition exist, the same range as for the Gulf as a whole. ECAS takes three to eight weeks and runs alongside. A report to a standard edition more than two years superseded means retesting first, and a factory visit, where the body wants one, adds scheduling time.

Keep reading

On the Emirates and the Gulf

Tell us what you are exporting

Send the product name, HS code and technical data. You get back the applicable route, the document list and a timeline, before any commitment.