Certifying a Wireless Pressure Sensor in Brazil
A device that is both a measuring instrument and a radio transmitter faces two sets of requirements. The four steps, and the three that trip people up.


Product name, HS code and technical data, enough for us to scope the route.
Your part
A specialist confirms the regulations that apply and the document type your product needs.
Our part
You send the supporting documents; we sign a contract with fixed scope and timeline.
Both sides
Laboratory testing, factory inspection and customs clearance, coordinated by us.
Our partIssued, registered, and delivered. We close the project.
Your partINMETRO certification is issued by an OCP accredited by Cgcre, and never by INMETRO itself. INMETRO certification is issued by an OCP (Organismo de Certificação de Produto) accredited by Cgcre, INMETRO's accreditation arm, and never by INMETRO itself. The general rules sit in Portaria INMETRO 200/2021, and the portaria for your product family decides whether certification is compulsory, which ABNT standard applies, which certification model is used, and how often the factory is audited. Two facts surprise most foreign manufacturers. The certificate is held by a Brazilian company with a CNPJ, and under the most common model the OCP audits the plant wherever it is.
Certification is compulsory only where a portaria names the product family, such as toys under Portaria INMETRO 563/2016. That portaria fixes the ABNT standard, the certification model and the audit cycle.
Asking INMETRO itself to certify the product costs weeks.
Under Modelo 5 the OCP type-tests the product, audits the factory's quality system wherever the plant is, then runs surveillance and periodic re-audits. Modelo 7 certifies one lot and has no audit.
Budget auditor travel to your plant from the very first estimate.
A Brazilian company with a CNPJ holds the certificate, which an OCP accredited by Cgcre issues. The certificate is not transferable, so one held by your importer stays tied to that importer.
An appointed representative keeps the certificate independent of your distributor.
An INMETRO project can stop before any testing starts, when the first request went to INMETRO itself and weeks passed. After that, the stops are specific. The OCP's accredited scope turned out not to include your product family. Auditor travel to the plant was never in the estimate. A CB or CE report was offered where the OCP needed a report against the ABNT standard in the portaria, from a Cgcre-accredited laboratory, on samples it selected.
Accreditation is per scope, and switching OCPs means starting the file again, so choose the next body against its written scope before anything is signed. An issued certificate belongs to the CNPJ holder and cannot be transferred; one held by a former importer means certifying again. The registration number is what buyers, retailers and customs brokers check. Existing CB reports can sometimes serve as a basis, since most ABNT electrical standards are adopted IEC texts.
Everything here is something to find before the project starts. The first reply says which of it can go into the file as it is.
One specialist owns your file from the first email to the registered certificate. Every one of them has recorded a briefing on their field.
Each stage is a service of its own, with a page that says what it produces and what it needs from you.
The cheapest stage decides the cost of every stage after it. What a route assessment names, and the four decisions it locks down.
Read the pageAccreditation is per standard and per laboratory, never general. How to choose one the destination accepts, and test once for several markets.
Read the pageThe file is the certificate’s foundation and it is the manufacturer’s to produce. What it has to contain, and what cannot be written retrospectively.
Read the pageAudits turn a schedule from weeks into months and cannot be compressed. What auditors check, and how to be ready for the first visit.
Read the pageFour major markets refuse to certify a foreign manufacturer directly. What the appointment obliges, and why a distributor is the wrong holder.
Read the pageA correct certificate and a wrong label still stops at the border. What each market demands on the artwork, and when to check it.
Read the pageOnly if a portaria says so. Compulsory certification covers the product families with a published portaria: toys under Portaria INMETRO 563/2016, household electrical appliances under Portaria INMETRO 371/2009, both as amended, and a long list from automotive components to medical devices. Outside those families certification is voluntary and a commercial decision. Each portaria is its own rulebook. Two families that look adjacent can follow different models, different standards and different audit cycles, with costs that bear no resemblance to each other.
Searching for "how to get INMETRO certification" as if it were one process is the first wrong turn. The right first question is which portaria names your product, because that document also fixes how long the whole project takes.
Portaria INMETRO 200/2021, the general product certification requirements (RGCP), defines the models, and each product portaria picks one. Modelo 5 is the standard for series production: type testing in a laboratory, an initial audit of the factory's quality system, then surveillance with samples pulled from the market or the plant and a periodic re-audit. Modelo 7 certifies a lot: the OCP samples and tests that consignment, and the certificate dies with it. Other models cover type testing without a factory audit and appear in fewer portarias.
The model is the INMETRO certification cost driver. Modelo 5 means an auditor at your plant, wherever it is, with travel billed to you, and a re-audit at the interval the portaria sets. Modelo 7 means no audit and no maintenance, but a fresh certificate for every shipment, which only pays for a one-off consignment.
An Organismo de Certificação de Produto is a private body accredited by Cgcre for a defined scope. It reviews the documents, sets the test plan against the standard in the portaria, sends samples to a laboratory accredited by Cgcre, audits the factory, issues the certificate and registers the product with INMETRO.
Accreditation is per scope. An OCP accredited for household appliances cannot necessarily certify toys, and switching bodies means starting the file again. Ask for the accreditation scope in writing before you sign. Ask, too, whether the OCP has audited outside Brazil before; the portaria does not care, but your schedule will.
A Brazilian company with a CNPJ. A foreign manufacturer cannot be the holder, so most projects route it through the importer. That works, and it ties the certificate to that importer: it is not transferable, so changing distributor means certifying again. A representative appointed for the purpose keeps the certificate independent of the commercial relationship.
After issue, the OCP registers the product with INMETRO, and the registration number is the reference a buyer, a retailer or a customs broker checks. A certificate without a current registration is a piece of paper.
Modelo 5 assesses the plant's quality system as well as the sample. For a manufacturer outside Brazil that means an auditor flying in, and that line item is missing from almost every first estimate. A maintained ISO 9001 system covers most of what the auditor asks about: incoming inspection, final testing, calibration, records.
Maintenance is the other half. The certificate requires follow-up audits and retesting at the intervals the portaria sets, so the three-year cost is often larger than the first-year cost.
| Step | Who | What it produces |
|---|---|---|
| Find the portaria | You, or us | Model, standard, audit frequency |
| Appoint an OCP | The applicant (CNPJ holder) | Test plan and a contract, within the OCP's accredited scope |
| Testing | Laboratory accredited by Cgcre | Test report against the ABNT standard in the portaria |
| Factory audit | The OCP, under Modelo 5 | Assessment of the quality system, at the plant |
| Certificate | The OCP | Issued to the CNPJ holder |
| Registration | The OCP, with INMETRO | Registration number that import documents reference |
The audit happens at the manufacturing plant. For a factory outside Brazil that means auditor travel, and it is the line item missing from almost every first estimate.
No. INMETRO accredits certification bodies through Cgcre and keeps the register; the certificate is issued by an OCP under the rules of Portaria INMETRO 200/2021. Asking INMETRO to certify a product is the most common first wrong turn, and it costs weeks.
Not directly. The holder must be a company registered in Brazil with a CNPJ. Using the importer works but ties the certificate to that relationship; a representative appointed for the purpose keeps it independent of your distribution.
Under Modelo 5, yes. The assessment covers the production line, incoming inspection, final testing and the records behind them. A maintained ISO 9001 system already covers a large part of what is asked. Modelo 7, lot certification, has no audit and no follow-up, but every shipment needs its own certificate.
As a basis, sometimes. The OCP needs a report against the ABNT standard in the portaria from a laboratory accredited by Cgcre, on samples it selected. CB reports travel further than national European reports because most ABNT electrical standards are adopted IEC texts, but neither removes the audit.
A device that is both a measuring instrument and a radio transmitter faces two sets of requirements. The four steps, and the three that trip people up.
The five-step INMETRO route into Brazil for industrial, electrical and laboratory equipment, with realistic timelines and what it buys you in tenders.
Requirements misread, documents incomplete, budgets set too late, samples stuck in transit, the four failures that stall electrical certification.
Send the product name, HS code and technical data. You get back the applicable route, the document list and a timeline, before any commitment.