Location: GlobalEnglish

Choose your location

info@wwbridges.com+971 52 912 3132
English
European Union

EMC directive certification under Directive 2014/30/EU

For EMC, the first reply names the emission and immunity standards for your product and says whether the report you already hold can go into the file as it is.

We’ll call you back within an hour.

We will call you back

We respect your time and your privacy. Your details are used to answer this inquiry and nothing else.

A few facts

EMC is a self-declaration, and the file is yours to keep

No certifier signs for you under 2014/30/EU. What the directive fixes instead is the evidence, the editions and how long you hold on to them.

  • 0 Notified Body required. Under Module A you test, document and sign
  • 10 years Keep the technical file after the apparatus is placed on the market
  • 2022 On 4 May, EN 55032:2012 and EN 55014-1:2006 stopped giving presumption of conformity
  • 4–12 Weeks from the first call to a signed declaration, most of it laboratory scheduling

Source: Directive 2014/30/EU and the Commission’s summary list of harmonised EMC standards

How it works

Five steps from an inquiry to a registered certificate

Typical timeline4 to 12 weeks, testing dependent

  1. You send the request

    Product name, HS code and technical data, enough for us to scope the route.

    Your part
  2. We confirm the route

    A specialist confirms the regulations that apply and the document type your product needs.

    Our part
  3. Documents and contract

    You send the supporting documents; we sign a contract with fixed scope and timeline.

    Both sides
  4. Testing and inspection

    Laboratory testing, factory inspection and customs clearance, coordinated by us.

    Our part
  5. You receive the certificate

    Issued, registered, and delivered. We close the project.

    Your part
  • One named specialist One person owns your file from the first email to the registered certificate.
  • Route fixed before testing Scheme, standard and laboratory are settled before a sample is tested, which is where most re-testing starts.
  • Registered documents Certificates and declarations issued by accredited bodies and entered in the official register, where customs can look them up.
  • Measured by the document The engagement ends when the certificate is issued and registered, whatever the hours took.
The short answer

When an EMC test report still counts

EMC directive certification is a self-declaration. Under Directive 2014/30/EU you test the apparatus for emission and immunity, write the technical documentation and sign the EU declaration of conformity yourself (Module A, internal production control). A Notified Body is optional, and under this directive it examines the design file rather than a sample (Module B, EU-type examination). Radio equipment is outside the directive and is assessed under the RED instead. The same EMC test report then supports the UKCA, EAC and G-Mark files, provided it was run on the production configuration to a standard edition still listed in the Official Journal.

  • You sign it Test for emission and immunity, write the technical documentation and sign the EU declaration of conformity yourself (Module A, internal production control).
  • Notified Body optional Under this directive it examines the design file rather than a sample (Module B, EU-type examination).
  • Radio module means the RED Radio equipment is outside 2014/30/EU and is assessed under the Radio Equipment Directive instead.
  • One report, four files The same EMC test report supports the UKCA, EAC and G-Mark files, provided it was run on the production configuration to an edition still listed in the Official Journal.
  • Module A declaration

    Under Directive 2014/30/EU you test for emission and immunity, write the documentation and sign the EU declaration of conformity yourself. A Notified Body under Module B is optional and examines the design file alone.

    Customs gives no weight to a lab certificate carrying a CE logo.

  • Editions still listed

    The Official Journal list decides which editions still give presumption of conformity. EN 55032:2012 and EN 55014-1:2006 stopped on 4 May 2022, and EN 55024:2010 on 16 September 2022.

    The report we send back most often cites EN 55024 from an outdated template.

  • The production sample

    We read each report against the production bill of materials: model, hardware revision, firmware version, cables, the operating modes Annex II requires, and the pass margins.

    Fit a new switched-mode supply and the conducted emission tests run again.

Already started elsewhere

EMC Directive file caught between the lab and the declaration?

EMC is the test most often failed at the first attempt, and a project booked with no room for a second session stops right there, although a ferrite, a filter or a grounding change fixes most first failures. The other stops sit inside the report itself. It cites a withdrawn edition such as EN 55024:2010, the sample differs from what the factory builds, or the product changed after testing and nobody reran the affected tests.

The documents that count are your signed EU declaration of conformity and the test report behind it, and you keep the file for 10 years after the apparatus is placed on the market. A laboratory certificate with a CE logo counts for nothing with market surveillance or customs. A report to a withdrawn edition is a test against a specification of your own choosing, so the file then has to explain how the essential requirements are met without the standard.

What we handle

  • Standard selection
  • EMC testing
  • Report review
  • Technical documentation
  • EU declaration of conformity

What to send us

Everything here is something to find before the project starts. The first reply says which of it can go into the file as it is.

  • The EMC test report, with the standard, edition and amendments applied
  • Model, hardware revision and firmware version of the sample that was tested
  • The production bill of materials, cables and power supply included
  • Schematics, and samples in production configuration if testing is still ahead
  • Any design or firmware change made since the test date

We’ll call you back within an hour.

We will call you back

We respect your time and your privacy. Your details are used to answer this inquiry and nothing else.

  • 2010 Year of foundation
  • 1300+ Certification projects
  • 40+ Countries served
  • 15+ Types of certificates

What does the EMC Directive cover?

The EMC directive, 2014/30/EU, applies to equipment, which Article 3 splits in two. An apparatus is a finished appliance, or a combination sold as one functional unit, that can generate electromagnetic disturbance or be affected by it. A fixed installation is a combination of apparatus assembled for permanent use at one location. Apparatus is CE marked. A fixed installation is not: it is built to good engineering practice, and the person responsible keeps that documentation while the installation runs (Article 19).

The essential requirements in Annex I are two sentences. Emission: the disturbance generated must not exceed the level above which radio, telecommunications or other equipment cannot operate as intended. Immunity: the equipment must keep working without unacceptable degradation in the disturbance expected in its intended use. The standards, the set-ups and the limits in dBµV are the way you show those two sentences are met.

Article 2 takes four groups out: radio equipment, aeronautical products, amateur radio kit not sold on the market, and equipment that by its physical nature can neither disturb nor be disturbed. Clients reach for the last exclusion, and it covers nothing with a switched-mode supply, a motor or a microcontroller. The first changes the file: add a Wi-Fi or Bluetooth module and the whole product becomes radio equipment, so EMC compliance is declared under the Radio Equipment Directive, with the radio approval on top (see telecom type approval). The test is still run; the directive named on the declaration changes.

Do I need a Notified Body for EMC compliance?

No, for apparatus. Article 14 gives two routes and you choose. Under Module A, internal production control (Annex II), you assess the electromagnetic compatibility of the apparatus, build the technical documentation, keep series production in conformity and sign the declaration. Module B, EU-type examination (Annex III), adds a Notified Body, and under this directive the body examines the technical documentation without examining a specimen: it assesses the design.

Module B earns its fee on a product with no harmonised standard, or a partly applied one, when a buyer wants a third party's name on the file. The Commission's EMC page warns that certificates from bodies not acting as notified bodies are not a recognised means to prove compliance, carry no weight with market surveillance or customs, and must not bear a CE marking. We still see a test lab's "certificate of conformity" with a CE logo treated as the approval; the document that counts is your signed EU declaration of conformity, and behind it the test report.

EMC testing for CE marking sits inside the timeline on our CE marking page: four to twelve weeks, most of it laboratory scheduling. EMC is the test most often failed at the first attempt, so we book the slot with room for a second session; a ferrite, a filter or a grounding change fixes most first failures.

Which standards apply, and what must the EMC test report contain?

The Official Journal list for 2014/30/EU names the standards that give presumption of conformity, and the product picks the standard. Multimedia and IT equipment: EN 55032:2015 for emission and EN 55035:2017 for immunity, both with amendment A11:2020. Household appliances and electric tools: EN 55014-1:2017 with A11:2020 and EN 55014-2. Lighting: EN IEC 55015:2019 for emission, EN 61547 for immunity. Where no product standard fits, the generic standards apply by environment: EN 61000-6-3 and EN 61000-6-1 for residential, commercial and light-industrial use, EN 61000-6-4 and EN 61000-6-2 for industrial use.

Editions matter because the list withdraws them. EN 55032:2012 stopped giving presumption of conformity on 4 May 2022, EN 55014-1:2006 on the same day, EN 55024:2010 on 16 September 2022. A later report to the withdrawn edition is a test against a specification of your own choosing, and the file must then explain how the essential requirements are met without the standard. The report we send back most often for this reason is an EN 55024 report from a lab that never updated its template.

Annex II, point 3, lists what the technical documentation must hold: a general description, drawings and circuit schemes with the explanations needed to read them, the harmonised standards applied in full or in part, calculations and examinations, and the test reports. For the EMC test report to be usable there we check five things: model, hardware revision and firmware version of the sample; configuration and cables against the production bill of materials; standard, edition and amendments; the operating modes exercised, since Annex II requires every representative configuration to be covered; and the pass margins. One decibel of margin on radiated emission is a pass on the day and a question at the next production change.

Where else does the EMC test report count?

Three other files take the same report. Great Britain kept the directive's essential requirements in the Electromagnetic Compatibility Regulations 2016, so the same accredited evidence supports the UKCA declaration; what changes is the declaration and the designated standards list. In the Eurasian Economic Union the same phenomena sit under TR CU 020/2011, and an EAC certificate for a household appliance comes from a body listed in the EAEU unified register; the measurements often coincide, but the body will normally want its own sample and the documents in Russian. For the Gulf, the G-Mark file under BD-142004-01 is built from the test reports you already hold, checked against the GSO editions.

The same three failures break every one of those files. A product changed after testing is the first: Article 7(4) requires changes in design or characteristics to be taken into account, and a new switched-mode supply changes conducted emission. A report on a sample that differs from production is the second; it surfaces when a market surveillance authority buys the product off the shelf. A test to a withdrawn edition is the third. All three are caught by reading the report against the bill of materials before it goes into the file, which is the review we do before the declaration is drafted.

Harmonised standards most products meet first

ProductEmissionImmunityNote
Multimedia, IT and audio equipmentEN 55032:2015 + A11:2020EN 55035:2017 + A11:2020Replaced EN 55022 and EN 55024
Household appliances, electric toolsEN 55014-1:2017 + A11:2020EN 55014-2EN 55014-1:2006 withdrawn 4 May 2022
Lighting equipmentEN IEC 55015:2019 + A11:2020EN 61547:2009EN 55015:2013 withdrawn 4 May 2022
No product standard; residential, commercial, light industryEN 61000-6-3EN 61000-6-1Generic standards, by environment
No product standard; industrialEN 61000-6-4EN 61000-6-2Generic standards, by environment
Radio equipment (Wi-Fi, Bluetooth, cellular)Outside 2014/30/EUOutside 2014/30/EUAssessed under RED 2014/53/EU

Editions and withdrawal dates come from the Commission's summary list of harmonised standards under 2014/30/EU. The list is amended by implementing decision, so confirm the edition on the day the report is written.

Frequently asked questions

Is there an EMC certificate?

Not one that proves compliance. Electromagnetic compatibility certification under Directive 2014/30/EU ends in an EU declaration of conformity you sign, backed by the test report. A Notified Body can issue an EU-type examination certificate under Module B, which is evidence inside the file. A laboratory certificate with a CE logo is neither, and the Commission says such voluntary certificates mean nothing to market surveillance or customs.

Do I need to retest after a firmware or power-supply change?

Often, and the directive expects you to decide it in writing. Article 7(4) requires changes in design or characteristics to be taken into account for series production. A new power supply changes conducted emission and needs the emission tests repeated; firmware that alters clock rates, radio duty or motor control can change both emission and immunity. Record the analysis in the file and rerun the affected tests.

Can I use the EMC test report for UKCA, EAC or G-Mark?

For UKCA, yes: the Electromagnetic Compatibility Regulations 2016 keep the same essential requirements, and the same evidence supports the UK declaration. For an EAC certificate under TR CU 020/2011 the report is a starting point, because the certification body normally wants its own sample. For the G-Mark the notified body checks the reports against the GSO editions. Each needs the production configuration in the report.

Why is a product with Wi-Fi not under the EMC Directive?

Because Article 2 excludes radio equipment, and a mains-powered appliance with a Wi-Fi module is radio equipment in full. Its EMC requirements come from Article 3.1(b) of the Radio Equipment Directive 2014/53/EU, so the declaration cites the RED and not 2014/30/EU. The emission and immunity tests are still run; what changes is the legal text on the declaration and the radio standards added on top.

Keep reading

On EMC, electrical safety and the European market

Tell us what you are exporting

Send the product name, HS code and technical data. You get back the applicable route, the document list and a timeline, before any commitment.