Scheme 5d Under TR CU 010: A Step-by-Step Guide

Scheme 5d is the TR CU 010 declaration route for equipment going to hazardous industrial facilities. It requires a factory inspection by an expert from an accredited certification body, produces a Type Certificate first, and only then permits the declaration to be registered, valid for 5 years.
Step 1, Evaluate the enquiry
Everything needed to process a request: the technical specification of the product, drawings, European or manufacturer’s test reports, and the HS code.
In the case this guide follows, the expert confirms from that data that the product, as explosion-proof equipment, falls under TR CU 012, On safety of equipment intended for use in explosive atmospheres, and that TR CU 010, On the safety of machinery and equipment, applies as well. Two regulations is the normal outcome for this class of product.
Step 2, Choose the certification scheme
TR CU 010 offers several schemes: 1d, 3d and 5d. The choice depends on the type of facility where the equipment will be installed and operated.
Here the client states the facility is a chemical plant. Under the industrial safety classification, that is a hazardous facility, because the risk of accidents or emergency situations is high. That makes scheme 5d applicable.
One practical note: confirm the scheme with the end client as well. They know which scheme they are expected to receive approval documents under, and they are the ones who will be inspected against it.
Scheme 5d applies where:
- The equipment is supplied to hazardous industrial facilities
- It is impossible to test the products before they are installed at the location where they will operate
- The products are innovative
Step 3, Start the process
With the scheme settled as 5d for a hazardous facility, document collection begins.
TR CU 010 requires two mandatory documents that catch out first-time applicants:
- The Justification of Safety
- The technical passport
Both must be prepared in the Union’s working language and meet the applicable GOST standards. Neither is a document that can be assembled at the end of a project.
Step 4, What happens at the factory inspection?
To issue a declaration of conformity under TR CU 010 by this route, an expert from an accredited certification body visits the manufacturer’s production site.
| Aspect | Detail |
|---|---|
| Typical duration | 1 day |
| Purpose | Examination of product construction, and on-site testing of the declared product |
| Test basis | The manufacturer’s own testing methodology, only |
That last row matters more than its length suggests. The tests are run against the manufacturer’s methodology, so the methodology itself has to be in a state to be followed by someone who has not seen it before.
Step 5, Register the declaration
Once the inspection is complete and the expert reaches a positive decision, a Type Certificate is issued. The declaration of conformity can only be registered on the basis of that Type Certificate, the sequence does not run the other way.
| Item | Detail |
|---|---|
| Validity of the declaration | 5 years |
| Applicant | Must be a legal resident of an EAEU member state |
Sources
- TR CU 010/2011, On the safety of machinery and equipment, Eurasian Economic Commission
- TR CU 012/2011, On safety of equipment intended for use in explosive atmospheres
- National classification of hazardous production facilities
Frequently asked questions
When does scheme 5d apply?
In three situations: the equipment is supplied to a hazardous industrial facility; it is impossible to test the products before they are installed where they will operate; or the products are innovative. TR CU 010 also offers schemes 1d and 3d, and the facility type is what decides between them.
What happens during the factory inspection?
An expert from an accredited certification body visits the manufacturer's production site, typically for one day, to examine the product construction and carry out on-site testing of the declared product. Tests are performed against the manufacturer's own testing methodology.
What documents does TR CU 010 require?
Two mandatory ones stand out: the Justification of Safety and the technical passport. Both must be prepared in the Union's working language and meet the applicable GOST standards. Neither can be produced quickly at the end of a project, so both belong in the schedule from the start.
Not sure which of these applies to your product? Send it and we will tell you